Plans prepared for Factory Building for California Glass Insulator Co.

[Trade Journal]

Publication: Southwest Contractor and Manufacturer

Los Angeles, CA, United States
vol. 7, no. 21, p. 8, col. 3


BUILDING NEWS.


Los Angeles Notes

·

·

FACTORY BUILDING — Archt. W. J. Saunders, 512 Wright & Callender Bldg., has prepared plans for a number of buildings to be erected at Long Beach for the California Glass Insulator Co., Stanley Stonaker, secretary, 704 Union Trust Bldg. There will be a melting building, 60x30 ft. with a wing 30x100 ft.; machine shop, 50x [missing text] ft.; store building, 30x50 ft.; office, 30x [missing text] ft.; loading platform 10x80 ft.; storage bin for sand and broken glass. The melting room and machine shop will be frame with galvanized corrugated iron sides and roof, and concrete foundations and floors. The store rooms will be frame with concrete foundation, rustic siding, composition roof, pine trim and floors.

·

·

--

Keywords:California Glass Insulator Company
Researcher notes:Scan of page had portions of right side cropped cutting off some dimensions of the buildings being described.
Supplemental information: 
Researcher:Bob Stahr
Date completed:January 18, 2023 by: Bob Stahr;